Plaats van herkomst: China
Merknaam: Brictec
Certificering: CE ISO
Betaling & het Verschepen Termijnen
Min. bestelaantal: 1
Prijs: USD 5,000,000
Verpakking Details: Aangepast
Levertijd: 360 dagen
Betalingscondities: L/C, T/T
Levering vermogen: Aangepast
Productienaam: |
kleibaksteen het maken machine |
Baksteen snijmethode: |
Automatisch |
Functie: |
Vervaardiging van klei van vaste bakstenen/hole blokken |
Automatisch: |
Ja |
Vuursysteem: |
Gas, zware olie, verpulverde steenkool |
Bakstenentype: |
Aangepast |
Project: |
Irak KTB |
Oventype: |
Tunneloven |
Baksteen het drogen: |
de laagdroger van /single van de tunneldroger |
Het drogen technologie: |
enige laag drogere kamer |
Productienaam: |
kleibaksteen het maken machine |
Baksteen snijmethode: |
Automatisch |
Functie: |
Vervaardiging van klei van vaste bakstenen/hole blokken |
Automatisch: |
Ja |
Vuursysteem: |
Gas, zware olie, verpulverde steenkool |
Bakstenentype: |
Aangepast |
Project: |
Irak KTB |
Oventype: |
Tunneloven |
Baksteen het drogen: |
de laagdroger van /single van de tunneldroger |
Het drogen technologie: |
enige laag drogere kamer |
The construction of a clay sintered brick plant is a systematic project consisting of several key sections: raw material yard, forming workshop, drying system, tunnel kiln firing system, finished brick packaging line, and supporting utilities.
The entire process follows the principles of scientific planning, phased construction, quality first, and safety control, ensuring stable operation after commissioning.
Our product pricing is customized according to your production capacity requirements and detailed project drawings, ensuring the most cost-effective solution for your brick plant.
The tunnel kiln is the core unit of brick firing, and its construction quality directly determines production efficiency and product performance.
| Control Item | Requirement | Inspection Standard |
|---|---|---|
| Refractory Material | Al2O3 ≥ 55% | Sampling & certification |
| Masonry Accuracy | Joint 2-3mm, vault deviation ≤5mm | Field measurement |
| Track Alignment | Level error ≤3mm, alignment ≤2mm | Laser inspection |
| Thermal Insulation | Outer wall temp ≤65°C | Thermal imaging |
| Combustion System | No gas leakage, uniform flame | On-site commissioning |
| Roof Stability | No deformation or displacement | Dynamic monitoring |